Why this matters

Raising a condenser onto a platform or moving an air handler to the attic is the single most effective thing a shop can do to keep a house in a flood zone livable after the water goes down. It is also easy to do in a way that fails: a platform built to the wrong datum that leaves the coil 8 inches under the line, a water heater raised with its relief valve now discharging at head height, a condenser three and a half feet up that nobody can service without standing on a stack of pavers. This card is the procedure for doing it to a number, keeping it serviceable, and getting it signed off. What the flood zones and elevations mean is covered in See related: Flood Zones, Base Flood Elevation and Equipment.

The procedure

1. Find the required elevation and put it on the wall. Get the base flood elevation from the FIRM and the community's freeboard from its floodplain ordinance; their sum is the design flood elevation (DFE). Get a known elevation on the house in the same vertical datum, usually from the elevation certificate (the garage slab or the top of the bottom floor), and carry the DFE from that point to the equipment location with a laser or water level, marking a line on the wall or a post. Why: everything else is measured from this line. Skip it, or mix NAVD 88 and NGVD 29, and the platform can be built confidently to the wrong height. The line is what the lowest flood-vulnerable part of each unit has to clear, which on most equipment is the bottom of the cabinet or base pan, not the top.

2. Choose between a platform, a wall mount and a relocation. A platform keeps equipment near where it was and suits condensers, water heaters and packaged units, but gets awkward past about 4 feet of rise. A wall bracket suits light condensers and minisplit outdoor units, fastened into structure, never into cladding. Relocation to the attic, an upper floor or a roof suits air handlers and furnaces, especially where the ducts already run overhead or must be moved there anyway. Why: the choice decides the line set length, the condensate route, the service access and the permits. Skip the comparison and you build a 6-foot platform where a wall bracket or an attic move was the easier answer.

3. Design the support for the flood, not only the weight. A platform carries the equipment's weight, a tech's service load and, in a flood zone, the push of moving water and floating debris against its legs. Use open framing on posts anchored to footings or the slab, in flood-resistant materials (concrete, masonry, preservative-treated wood rated for ground contact, hot-dip galvanized or stainless hardware), not a solid block enclosure that becomes a dam. In a V zone it must be open. The equipment's wind tie-down then applies to its connection to the platform, and the platform's connection to the ground. See related: How to Anchor an Outdoor Unit for Wind. Where the rise, the equipment weight or the zone goes past what a standard detail covers, the platform is an engineer's drawing; bring the unit weights and footprint, the DFE, the grade elevation and the flood zone.

4. Reroute everything that connects to it. Each connection has its own rule:

  • Refrigerant lines. Recover the charge before disconnecting, using an EPA Section 608 certified technician under 40 CFR Part 82 Subpart F; braze with a nitrogen purge; add charge for added line length per the manufacturer. Brazing heats the work and nearby framing, so keep a heat shield and an extinguisher at hand and check the cavity before you leave.
  • Condensate. Gravity to an approved location from the new height. A pump below the DFE is the part that floods first.
  • Ducts. No supply or return duct stays below the DFE; it moves overhead with the equipment.
  • Wiring. The disconnect goes within sight of the unit and at or above the DFE where practical. Wiring that must pass below the line runs in a wiring method listed for wet locations, as the electrical code adopted there allows.
  • Gas and water heater connections. Re-pipe with a sediment trap and leak-test to the code's test before gas is restored. A raised water heater's temperature and pressure relief discharge still terminates where the plumbing code puts it, at the IRC's limit of not more than 6 inches above the floor or a waste receptor (P2804.6.1 in the 2021 edition, as adopted), so the discharge pipe runs down the platform. A relief valve left discharging at platform height scalds whoever is standing there.

Why this step: an elevated unit with a flooded condensate pump, a crawlspace duct or a disconnect at grade fails in the same flood it was raised for.

5. Keep it serviceable. Leave the working space in front of the service side the code requires (the IRC asks for a level space at least 30 by 30 inches, M1305.1 in the 2021 edition, as adopted). In an attic, the IRC requires an opening and a passageway large enough to remove the largest appliance and not less than 30 inches high and 22 inches wide, no more than 20 feet long, with solid flooring at least 24 inches wide (M1305.1.3). A platform a tech stands on that is more than 30 inches above grade needs a guard and safe access; one serviced from a ladder at grade needs its service panels facing an open side. Why: equipment nobody can reach does not get maintained, and the next tech will stand on whatever is nearest.

6. Get the approvals before you build. Work in a special flood hazard area generally needs a floodplain development permit from the community as well as the building, mechanical, electrical, plumbing and gas permits. The floodplain administrator may also need to decide whether the overall project is a substantial improvement, which changes what else has to be done. See related: The Substantial Improvement Fifty Percent Rule. Why: building first and asking later can mean rebuilding.

7. Restore and commission. This is the step that puts gas, power and refrigerant back, so each gets its own check. Gas: leak test passed, then a gas-qualified tech relights and confirms draft and combustion, with a CO reading at the draft hood or vent. Refrigerant: pressure test and evacuation to the manufacturer's level before releasing the charge. Electrical: disconnects and covers on, then close the breaker standing to the side of the panel. Run every unit and confirm condensate drains at the new height.

8. Update the record. Note the as-built elevation of the lowest part of each unit in the same datum as the DFE, with photos of the measurement. If the owner has an elevation certificate, a surveyor can update the machinery elevation it records; insurers and future buyers read it.

The platform, in section

The geometry is what people get wrong, so here it is drawn, for a condenser on posts.

            +-------------------+
            |                   |  service panel faces
            |     CONDENSER     |  the open side
            |                   |
            +---+-----------+---+  base pan = lowest part
  ==========+===+===========+===+===  platform deck
  DFE line -|- - - - - - - - - -|- - - deck top at or
            |                   |      above this line
         post               post  open framing, no walls
            |                   |  disconnect above DFE
            |                   |  on a post or wall
  //////////+///////////////////+///  grade
         footing            footing

The DFE line is a measured mark carried from the certificate, and the deck top sits on or above it so the base pan does too. Nothing hangs below the deck except the posts and a line set in its protective cover.

A worked example: a garage water heater and a side-yard condenser

A slab-on-grade house with an attached garage sits in an AE zone with a BFE of 8.0 ft NAVD 88. The town adds 1 ft of freeboard, so the DFE is 8.0 plus 1.0, or 9.0 ft. The elevation certificate gives the garage slab at 6.1 ft, and the shop measures the side-yard grade at the condenser at 5.6 ft from that slab with a laser level. The administrator has confirmed the project is not a substantial improvement and issued a floodplain permit for raising the two units.

The water heater. Its base sits on the garage slab. 9.0 minus 6.1 is 2.9 ft, or 34.8 inches of required rise. A 36-inch platform puts the base at 6.1 plus 3.0, or 9.1 ft, 0.1 ft over the line. The platform has to carry a 50-gallon tank full: 50 gallons at about 8.3 pounds each is about 415 pounds of water, plus the tank, so call it 550 to 600 pounds, before anyone leans on it. The relief discharge pipe runs from the valve down the platform leg to end within 6 inches of the slab, and a drain pan goes under the tank. The gas line is re-piped with a new sediment trap, leak-tested, and the heater relit with a draft and CO check.

The condenser. 9.0 minus 5.6 is 3.4 ft, or 40.8 inches of rise. The shop builds the deck at 42 inches, putting the base pan at 5.6 plus 3.5, or 9.1 ft. At 42 inches, a deck someone stands on would be over the 30-inch guard threshold, so the shop chose a deck sized only for the unit, with the service panel facing the open yard and serviced from a ladder at grade; that is written on the ticket so the next tech does not climb onto it. The line set adds about 4 feet of run, and the charge is adjusted per the manufacturer's added-length figure. The disconnect moves from the wall about 3 ft above grade, at elevation 8.6 ft and under the line, to a post at elevation 10.0 ft, which is 10.0 minus 5.6, or 4.4 ft above grade and 1.0 ft above the DFE.

What would change it. In a V zone the garage would be a breakaway or open enclosure and the water heater would likely move into the elevated living space instead. Had the slab been at 5.6 ft, the water heater would need 40.8 inches of rise, and a gas tank-type heater on a 3.5-foot platform starts to argue for an attic or upper-floor relocation of a different water heating type instead. And a certificate in NGVD 29 would have to be converted before any subtraction above.

References

  • 44 CFR 60.3, NFIP floodplain management criteria; your community's floodplain ordinance.
  • International Residential Code R322, M1305.1 and M1305.1.3, and P2804.6.1, 2021 edition, as adopted by your jurisdiction.
  • 40 CFR Part 82, Subpart F (refrigerant management and Section 608 technician certification).
  • FEMA P-348, Protecting Building Utility Systems From Flood Damage.
  • See related: Flood Zones, Base Flood Elevation and Equipment; The Substantial Improvement Fifty Percent Rule; How to Anchor an Outdoor Unit for Wind.